37.5 MW / 150 MWh Battery Energy Storage System

< Back to projects

Client: Confidential
Location: California

To partially offset a potential natural gas shortage in Southern California, a confidential California utility pursued the fast-track acquisition of 37.5 MW of battery energy storage on its system. As Owner’s Engineer for the project, POWER provided battery functional specifications and supported successful delivery and installation at two sites. The projects are designed to provide daily schedule peaking power—enough to power about 20,000 homes for four hours—to the CAISO system, reducing dependence on gas-fired “peaker” plants.